Data collection, data conversion, data supplementation, the municipalities of Rockenhausen, Alsenz-Obermoschel and Winnweiler

In the municipalities of Rockenhausen, Alsenz-Obermoschel and Winnweiler, the existing sewage pipes were measured, inspected and recorded in a sewage and water data base. Subsequently, a structural rehabilitation strategy was developed and the digital data handed over to the client.

Services provided by igr

  • Surveying
  • Inspection
  • Inventory documentation
  • Condition classification
  • Hydraulic calculation
  • Structural Rehabilitation design

Key figures for Rockenhausen

  • ca. 35 km mixed water sewage pipework, DN 100 – DN 2000
  • ca. 56 km storm water sewage pipework, DN 100 - DN 1100
  • ca. 84 km waste water sewage pipework, DN 100 - DN 800
  • ca. 4 km river water pipework, DN 300 - DN 2700
  • ca. 109 km drinking water pipework (including feeder, supply, main and connection pipes)

Key figures for Alsenz-Obermoschel

  • ca. 10 km mixed water sewage pipework, DN 150 - DN 1200
  • ca. 18 km storm water sewage pipework, DN 200 - DN 2000
  • ca. 22 km waste water sewage pipework, DN 150 - DN 400
  • ca. 31 km drinking water pipework (including feeder, supply, main and connection pipes)

Key figures for Winnweiler

  • ca. 22 km mixed water sewage pipework, DN 150 - DN 1200
  • ca. 6 km storm water sewage pipework, DN 200 - DN 2000
  • ca. 5 km waste water sewage pipework, DN 150 - DN 400
  • ca. 32 km drinking water pipework (including feeder, supply, main and connection pipes)