
Current status and rehabilitation of the sewage network for the Enkenbach-Alsenborn municipality
The current status of sewers, domestic connections, water pipes and road surfaces was tacheometrically surveyed and documented across the entire municipality of Enkenbach-Alsenborn. Therefore a sewer and water database was created.
A contract for a TV survey was tendered and monitored, and a structural rehabilitation strategy written from the resulting information. A hydro-dynamic sewer network calculation with long term series simulations was undertaken and a hydraulic rehabilitation strategy, as well as an overall rehabilitation strategy, developed.
The sewer rehabilitation was commissioned within a framework contract and is being carried out in accordance with the rehabilitation strategy.
Services provided by igr
- Surveying
- Inspection
- Current status documentation
- Current status evaluation
- Hydraulic calculation
- Rehabilitation strategy
- General drainage plan
Key figures
- ca. 120 km sewer network