- Details
- Written by Judith Trost
- Category: Aktuelles
- Hits: 2524
Palatia Ingenieur- und Städtebau GmbH, together with the city of Wörrstadt, is developing the second construction phase of the "Hinter der Bahn" building area with a size of 17.9 ha. To this end, igr has created an urban planning concept which, in accordance with the demands of the city council, should have a focus in climate protection. According to the current concept, over 300 residential units are being built. In the south an investor is planning a senior center.
- Details
- Written by Judith Trost
- Category: Aktuelles
- Hits: 2327
During the restructuring of the Bitburg airfield in 2017, igr was commissioned to prepare approval documents for the downgrading of the airfield to a special airfield.
- Details
- Written by Judith Trost
- Category: Aktuelles
- Hits: 2557
With the hiring of our new employee, Mr. André Nicolaus, we have expanded our competence.
- Details
- Written by Judith Trost
- Category: Aktuelles
- Hits: 2892
The previous branch of igr GmbH in Hamburg has been operating on the market as a subsidiary of igr under the name igr Aerodrome Engineering GmbH (igr AE GmbH) since October 1st, 2020.
- Details
- Written by Judith Trost
- Category: Aktuelles
- Hits: 2406
The previous branch office of igr in Erfurt will in future operate on the market with our subsidiary LINDSCHULTE as igr LINDSCHULTE Ingenieurgesellschaft mbH.