Description City Services Characteristics
"A 71 - Geraberg" industrial park Geraberg
TH
  • Engineering structures and traffic facilities
  • Technical equipment for power and gas supplies
  • 9.6 ha development area
  • 3 plots for major investors (max. 7.5 ha)
  • 1,800 m³ rain water retention basin
  • 1.2 km rainwater sewer, up to DN 1000
  • 1.3 km high pressure gas route DN 200 St
  • 13 km medium voltage cable route
  • Transformer station
  • Fire extinguishing tank V=240m³
  • ca. 300 m access road with turning area
  • Drinking water pressure boosting plant
All-year concept, Rennsteig Hörschel
TH
  • Traffic facilities
  • Engineering structures
  • Design surveying
  • Environmental management planning contribution
  • Road markings and signage planning
  • On-site construction supervision
  • Schmiedefeld carpark with inlineskater course
  • "Schillerbuche“ carpark, Bad Liebenstein
  • "Neue Ausspanne“ carpark inc. infiltration systems and    hazardous material retention in Tambach-Dietharz
  • Neustadt carpark inc. infiltration systems
  • "Kalte Küche“ carpark with monument, Sonneberg
  • "Hohe Sonne“ carpark under protected status requirements in Eisenach
  • Path construction "Hörschel“, Eisenach
Development of "Shopping City Zagreb" Zapresic
  • Plausibility investigation  
  • General planning services
  • Soil investigation  
  • Traffic facilities
  • Engineering structures
  • Technical equipment
  • Surveying
  • As-built documentation
  • Construction supervision
  • ca. 9 km traffic facilities
  • ca. 10 km water supply pipework
  • ca. 7.5 km waste water pipework with  pumping stations  
  • ca. 2.5 km waterway relocation
  • ca. 6 km rainwater sewer
  • ca. 4 km gas supply (medium pressure)
  • ca. 2 km gas supply (high pressuere)
  • Pressure reduction station
  • power supply
  • communications
  • Ducting systems
Development of an industrial park for GreenTech Datteln
NW
  • Engineering constructions (drainage)  
  • Traffic facilities
  • Technical equipment
  • Civil engineering
  • Study of innovative drainage strategies
  • Roundabout external development
  • 3 internal roundabouts
  • ca. 110,000 m² roadsa and footpaths
  • Street lighting
  • ca. 6,500 m rainwater sewers
  • 3 rainwater purification basins inc. residual drainage pumping stations and    cleaning systems
  • ca. 1,500 m² retention soil filters
  • ca. 6000 m pressure drainage system inc. 22 special-purpose structures
  • waste water pumping station to connect system to the waste water treatment plant
(3 construction phases)
  • Compressed air flushing station to avoid problem odours
  • ca. 2,700 m waster water pressure pipework to the external development
Development of World of Sports Herzogenaurach
BY
  • Traffic facilities
  • Outdoor facilities
  • Engineering structures
  • Technical equipment
  • Design-
  • and construction surveying
  • As-built documentation
  • Consultancy
  • Project management
  • Overall coordination
  • On-site construction supervision
  • ca. 3,200 m water pipework route
  • ca. 3,800 m rainwater pipework
  • ca. 4,200 m waste water pipework
  • ca. 1,300 m accessible media ducting
  • ca. 14,500 m² road areas
  • ca. 3,400 m district heating and   refrigeration pipes  
  • ca. 6,800 m ducting system
  • ca. 3,300 m² carparks
  • ca. 2,600 m ducting for communication and development
Hainich ecumenical clinic Mühlhausen
TH
  • Engineer constructions/li>
  • Traffic facilities
  • Civil engineering
  • On-site construction supervision
  • Performance, management and   interface coordination
  • ca. 1,250 m media ducting with SB profiles up to 2.50m x 2.50m  ca. 400 m rehabilitation of existing media ducting 
  • 40 cast-in-place concrete buildings, partly with cellars, built using a white tank method
  • ca. 11,000 m waste water and rain water sewer, up to DN 500
  • ca. 3.0 km cable protection pipe up to DA 160 in ducting routes
  • ca. 3,900 m drinking water pipework, up to DA 180
  • ca. 3.5 km new build of clinic roads/li>
  • Relocation, reorganisation and removal of existing supply and disposal systems
Master plan and specialist plans for the infrastructure development of the holiday resort Luštica Bay
  • Master plan for engineering construction, waste water, rain water,    gas supply , Drinking and fire extinguishing water, irrigation
  • Master plan for traffic facilities
  • Master plan for technical equipment (energy generation and distribution, telecommunication)
  • Master plan for innovative Infrastructure in accordance with material flow circulation (waste water purification for irrigation, combined heat and power plant for power supply/emergency power security, photovoltaic, wind energy)
  • Preliminary planning
  • Design planning, Phase 1
  • ca. 10,000 inhabitants
New build of an emergency defence center Erfurt
TH
  • Outdoor facililties
  • Traffic facilities
  • Engineering structures
  • Management coordination
  • On-site construction supervision
  • ca. 5,500 m² tarmac area
  • ca. 520 m² concrete area
  • ca. 240 m retaining walls h 0.55 -3.30 m
  • automatic gate and barrier systems, fencing, access control systems
  • Traffic lights
  • ca. 1,000 m waste water and rainwater sewers,    facade drainage
  • ca. 130 m drinking and service water pipework
  • ca. 1,220 m cable ducting
  • Greenery for facades, tree planting