Due to high demand in the area of Trier, the Föhren municipality wishes to develop a further development site, which is already identified in the land use development plan as a future residential area. Due to various restrictions, igr were commissioned to test, through a feasibility study, whether it was technically and economically possible to develop the site. Besides the difficult terrain, there was also the impact of noise pollution from the adjacent railway line to investigate, and urban development ideas to develop. It was possible to prove the economic feasibility through an estimate of costs.

Services provided by igr

  • Feasibility study

Key figures

  • Area of the site under investigation: ca. 8.3 ha
  • ca. 72 building plots