All year strategy, Rennsteig |
Erfurt TH |
- New build of car parks and road construction at a variety of locations along the Rennsteig/Thüringer forest
- Traffic facilities
- Engineering structures
- On-site construction supervision
|
- Construction costs ca. 0.9 m.
|
B 272 Hochstadt/ L 540 upgrading the junction to a roundabout in Hochstadt |
Hochstadt RP |
- Reconstruction of traffic junction and traffic facilities
- Engineering structures
- Design surveying
- Outdoor facilities
|
- Construction costs ca. 1.8 m.
|
Carriageway widening and renovating in the Grabower Straße in Magdeburg Rothensee |
Magdeburg ST |
- Rehabilitation and extension of traffic facilities
- Traffic facilities
- On-site construction supervision
- As-built documentation
- Engineering structures
- Design and construction surveying
|
- Construction costs ca. 0.5 m.
- Reorganisation of underground cable and pipework systems
|
Combined emergency services center ( can't find a direct English equivalent, but this title would give the right idea I think) ll in the town of Erfurt, development and outside facilities |
Erfurt TH |
- Comprehensive development
- Traffic facilities including mileage based heavy vehicle levy (LSA
- Engineering structures
- Construction supervision
- Outdoor facilities, technical equipment
|
- Construction costs ca. 1.9 m.
|
Construction of the car sharing carparks including bus turning loop and connection to the roundabout, Hitchinstraßein Bingen am Rhein(measures supported by local pubic transport (ÖPNV)) |
Bingen am Rhein RP |
- New build
- Traffic facilities
- Traffic engineering
- Engineering structures
- Landscape management
- On-site construction supervision
- Design and construction surveying
- Outdoor facilities
- Technical equipment
|
- Construction costs ca. 0.7 m.
|
Construction of the central bus station in Bingen am Rhein (measures supported under the Local Authority Traffic Fincancing Act (GVFG) and by local public transport (ÖPNV)) |
Bingen am Rhein
|
- New build during high traffic volumes
- Traffic facilities
- Engineering structures
- On-site construction supervision
- Design and construction surveying
- Outdoor facilities
- Health and safety coordination
|
- Construction costs ca. 2.1 m.
|
Developing World of Sports in Herzogenaurach |
Herzogenaurach BW |
- Rehabilitationa and extrension of traffic facilities
- As-built documentation
- Engineering structures and on-site construction supervision
- Design and construction surveying
- Outfoor facilities
- Technical constructions
- Civil engineering
- Technical equipment
|
- Construction costs were a double-digit million amount, AG did not wish the amount to be made public
|
Development of the "Rambusch" construction site in Otterbach |
Otterbach RP |
- New build
- Traffic facilities
- Engineering structures
- On-site construction supervision
- Design and construction surveying
- Outdoor facilities
- Civil engineering
- Technical equipment
|
- Construction costs ca. 4.4 m.
|
Development of the "Shopping City Zagreb in Zapresic |
Zapresic
|
- Construction site development on a 110 ha site
- Traffic facilities
- Engineering structures
- On-site construction supervision, technical equipment
- Design and construction surveying
|
- Construction costs ca. 48 m.
|
Development of the construction site "Am Hohrech/Am Hohrecher Weg/Auf Kipp" in Meisenheim |
Meisenheim RP |
- New build
- Traffic facilities
- Engineering structures
- On-site construction supervision
- Design and construction surveying
- Outdoor facilities
- Civil engineering
- Technical equipment
|
- Construction costs ca. 2.4 m.
|
Development of the housing area "Am Holler" in Otterberg |
Otterberg RP |
- New build
- Traffic facilities
- Engineering structures
- On-site construction supervision
- Design and construction surveying
- Outdoor facilities
- Civil engineering
- Technical equipment
|
- Construction costs ca. 1.0 m. (1st contruction phase)
- Construction costs ca. 1.0 m. (2nd construction phase)
|
Development of the industrial and commercial park "Südlicher Gutsweg" in the town of Eisfeld |
Eisfeld TH |
- Construction site development
- Traffic facilities
- Engineering structures
- On-site construction supervision, technical equipment
- Design and construction surveying
|
- Construction costs ca. 3.6 m.
|
Development road "Hans-Bongers-Straße" in Bitburg |
Bitburg RP |
- Rehabilitation and new build of the development access road
- Outdoor facilities
- Traffic facilities
- Surveying
- Engineering structures and on-site construction supervision
- Design and construction surveying
- Health and safety coordination
|
- Construction costs ca. 3.0 m.
|
Expansion of the junction of the B 271/A 6 in Grünstadt (re-design) |
Grünstadt RP |
- New build during high traffic volumes
- Bituminous construction method
- Traffic facilities
- Engineering structures
- On-site construction supervision
- Design and construction surveying
- Outdoor facilities
- Civil engineering
- Technical equipment
|
- Construction costs ca. 1.2 m.
|
Hertie-Umfeld in Bingen am Rhein |
Bingen am Rhein RP |
- Rehabilitation and new build of pedestrian zones
- Traffic facilities
- Outdoor facilities
- Engineering structures and on-site construction supervision
|
- Construction costs ca. 0.6 m.
|
Hospital on Spangdahlem airport (in partnership with PLANTEAM) |
Spangdahlem RP |
- Traffic facilities with drainage
- Engineering structures and on-site construction supervision
- Design and construction surveying
- Outdoor facilities
- Health and safety coordination
|
- Construction costs ca. 2.8 m.
|
Industial park "A 71 - Geraberg" in Erfurt |
Erfurt TH |
- Traffic facilities
- Engineering structures
- On-site construction supervision
- Design and construction surveying
- Outdoor facilities
- Health and safety coordination
|
- Construction costs ca. 5.5 m.
- Construction development area 9.6 ha
|
Industrial and commercial park "An der Salzbrücke" in Ritschenhausen |
Ritschenhausen TH |
- Complete rehabilitation and new installation of the supply and disposal technical infrastructure and the roads
- All work undertaken during normal operation of the organisation
- Traffic facilities
- Engineering structures
- On-site construction supervision
- Design and construction surveying
- Outdoor facilities
- Civil engineering
- Technical equipment
|
- Construction costs ca. 1.2 m.
|
K 9915, reshaping the junction of Kuhbergring - Egginger Weg in Ulm |
Ulm BW |
- Reconstruction of a traffic junction with traffic lights
- Traffic facilities
|
- Construction costs ca. 0.6 m.
|
L 415 from Badenheim to Spendlingen, upgrading with a combined foot/cycle path and roundabout |
Badenheim-Sprendlingen RP |
- Upgrading a section during normal traffic flow
- Traffic facilities
- Engineering structures
- Design surveying
- Outdoor facilities
|
- Construction costs ca. 2.5 m.
|
Maria-Hilf-Straße, Rochusallee, Rochusstraße in Bingen am Rhein |
Bingen am Rhein RP |
- Rehabilitation and reconstruction of town centre roads
- Traffic facilities
- Engineering structures and on-site construction supervision
|
- Construction costs ca. 0.6 m.
|
Modification of the junction of the B 51/L 138 in Konz to a roundabout |
Konz RP |
- Reconstuction of a T-junction
- Traffic facilities
- surveying
- Engineering structures
- Design surveying
|
- Construction costs ca. 0.65 m.
|
New build of a bypass in Imsweiler (B48) |
Imsweiler RP |
- New build
- Option comparison in line with the guidance for the planning decision "cutting or tunnel"
- Regional planning procedure
- Traffic facilities
- Engineering structures
- Design surveying
- Civil engineering
- Technical equipment
|
- Construction costs ca. 15 m.
|
New build of a inner city link road "Südring" in Bitburg |
Bitburg RP |
- Rehabilitation and new build
- Traffic facilities
- Engineering structures and on-site construction supervision
- Design and construction surveying
- Outdoor facilities
- Health and safety coordination
|
- Construction costs ca. 1.5 m.
|
New build of a road bridge over the Alsenz with connection roads in rockenhausen |
Rockenhausen RP |
- New build of traffic facilities
- Engineering structures
- Surveying
- Civil engineering
- Outdoor facilities
- Landscape management
- Hydraulic engineering works
- On-site construction supervision
- Design and construction surveying
- Outdoor facilities
- Health and safety coordination
|
- Construction costs ca. 2.8 m.
|
New build of a turning facility at the factory site of Keiper-Recaro in Rockenhausen |
Rockenhausen RP |
- Rehabilitation and extension of traffic facilities
- As-built documentation
- Engineering structures and on-site construction supervision
- Design and construction surveying
|
- Construction costs ca. 0.25 m.
|
New build of the ACP West on Wiesbaden Army Airfield |
Wiesbaden HE |
- New build
- Bituminous construction method
- Traffic facilities
- Engineering structures
- On-site construction supervision
- Design and construction surveying
- Outdoor facilities
- Civil engineering
|
- Construction costs ca. 2.2 m.
|
Reconfiguration of the Rognacplatz and Rognacalle in Rockenhausen |
Rockenhausen RP |
- Restructuring of traffic facilities
- Urban development framework plan for the development of the town centre
- As-built documentation
- Traffic facilities
- Engineering structures and on-site construction supervision
- Design and construction surveying
|
- Construction costs ca. 0.8 m.
|
Rehabilatation planning (conversion) of a new access road on the Bitburg airport |
Bitburg RP |
- Rehabilitation and new build of the development road
- Waste water disposal
- Water supply
- Culvert construction
- Outdoor facilities
- Surveying
- As-built documentation
- Engineering structures and on-site construction supervision
- Design and construction surveying
- Health and safety coordination
|
- Construction costs ca. 16.4 m.
|
Rehabilitation of the Brandenburg state clinic |
Brandenburg BB |
- Rehabilitation of existing building
- Traffic facilities
- Engineering structures
- On-site construction supervision
- Design and construction surveying
- Outdoor facilities
- Civil engineering
- Technical equipment
|
- Construction costs ca. 10 m.
- 45 ha total area
|
Rehabilitation of the outdoor facilities on the protected status "Villa Ingenheim" in Potsdam |
Potsdam BB |
- Rehabilitation of existing building
- Traffic facilities
- Engineering structures
- On-site construction supervision
- Design and construction surveying
- Outdoor facilities
- Civil engineering
- Technical equipment
|
- Construction costs ca. 2.3 m.
- 6.4 ha total area
|
Renovation of the protected-status property of the Hainich clinic in Mühlhausen. Complete renovation of the supply and disposal technical infrastructure; the road, paths and squares; and the outside areas. |
Mühlhausen TH |
- Rehabilitation of existing buildings
- All work undertaken during normal operation of the organisation
- Traffic facilities
- Engineering structures
- On-site construction supervision
- Design and construction surveying
- Outdoor facilities
- Civil engineering
- Technical equipment
|
- Construction costs ca. 27.5 m.
- ca. 40 ha
|
Reshaping of the B 272/L 540 junction near Hochstadt |
Hochstadt RP |
- Rerouting of the federal road, including the redesign of the junctions with the state road
- Underpasses for service roads, etc.
- Traffic facilities
- Engineering structures
- Design surveying
|
- Construction costs ca. 1.2 m.
|
Roundabout in Hitchinstraße/Schulheiß-Kollei-Straße/slip road onto the B 9 in Bingen am Rhein |
Bingen am Rhein RP |
- Rehabilitation and new build during high traffic volumes
- Bituminous surfaces
- Traffic facilities
- Engineering structures and on-site construction supervision
- Design and construction supervision
- Civil engineering
- Technical equipment
|
- Construction costs ca. 0.6 m.
|
Traffic-related development for the biomass power station in Enkenbach-Alsenborn |
Enkenbach-Alsenborn RP |
- New build
- Bituminous and paving construction methods
- Traffic facilities
- Engineering structures
- On-site construction supervision
- Design and construction surveying
- Outdoor facilities
- Civil engineering
- Technical equipment
|
- Construction costs ca. 17.3 m.
- Route length ca. 5 km
|
Upgrading of the Burgstraße in Enkenbach-Alsenborn |
Enkenbach-Alsenborn RP |
- Upgrading of an existing road
- New build of a car park
- Traffic facilities
- Engineering structures and on-site construction supervsion
- Design and construction surveying
|
- Construction costs ca. 1.2 m.
|
Upgrading of the junction of the L 413/L 428, including construction of a bus station in Stadecken-Elsheim |
Stadecken-Elsheim RP |
- New build
- Bituminous construction method
- Traffic facilities
- Engineering structures
- On-site construction supervision
- Design and construction surveying
- Outdoor facilities
- Civil engineering
- Technical equipment
|
- construction costs ca. 0.8 m.
|
Upgrading of the K 24 between Kusel and Körborn |
Kusel RP |
- Upgrading of the K 24
- Bituminous construction method
- Traffic facilities
- Surveying
- Landscape management
- Engineering structures
- Design surveying
|
- Construction costs ca. 0.9 m.
|
Upgrading of the K 85 and the K 84 in the Reichsthal through road (measures supported under the Local Authority Traffic Fincancing Act (GVFG)) |
Reichsthal RP |
- Rehabilitation
- Bituminous construction method
- Traffic facilities
- Surveying
- Landscape management
- Engineering structures
- Design surveying
|
- Construction costs ca. 0.5 m.
|
Upgrading of the Kusel-Diedelkopf through road |
Kusel RP |
- Upgrading of the existing town through road
- Traffic facilities
- Surveying
- Landscape managementespflege
- Engineering structures
- Design surveying
|
- Construction costs ca. 0.7 m.
- bituminous construction method
|
Upgrading of the L 386 in the Marienthal through road (measures supported under the Local Authority Traffic Fincancing Act (GVFG)) |
Marienthal RP |
- Rehabilitation
- Traffic facilities
- Surveying
- Landscape management
- Engineering structures
- on-site supervision
- Design and construction surveying
- Outdoor facilities
- Civil engineering
|
- Construction costs ca. 0.7 m.
- bituminous construction method
|
Upgrading of the L 386, the L 379 and the K 6 in the Dörrmoschel through road (measures supported under the Local Authority Traffic Fincancing Act (GVFG)) |
Dörrmoschel RP |
- Rehabilitation
- Bituminous construction method
- Traffic facilities
- Engineering structures
- Design surveying
- Outdoor facilities
|
- Construction costs ca. 1.5 m.
|
Upgrading of the Rosenhofstraße/Ziegelstraße in Enkenbach-Alsenborn |
Enkenbach-Alsenborn RP |
- Upgrading of an existing road
- Traffic facilities
- Engineering structures and on-site construction supervsion
- Design and construction surveying
- Health and safety coordination
|
- Construction costs ca. 0.4 m.
|
Upgrading of the through road in Würzweiler (L400 und L402) |
Würzweiler RP |
- Upgrading of the town through road with a border scheme
- Traffic facilities
- Engineering structures
- Outdoor facilities
|
- Construction costs ca. 1.4 m.
|
Upgrading of the town through road L 419 in Bingen-Kempten |
Bingen RP |
- Reconstruction during high traffic volumes
- Traffic facilities
- Engineering structures and on-site construction supervision
- Design and construction surveying
- Outdoor facilities
- Health and safety coordination
|
- Construction costs ca. 3.3 m.
|
Upgrading the Bahnhofstrasse and Mühlweg in Rockenhausen |
Rockenhausen RP |
- Rehabilitation and extension of traffic facilities
- Traffic facilities
- Engineering structures and on-site construction supervision
- Design and construction surveying
|
- Construction costs ca. 0.7 m.
|